It averages around 3 000 6 000 for partial removal demolition of a small to medium sized pool with easy access for heavy equipment which includes a minimal 8 10 inches layer of top soil but total costs can jump to 6 000 15 000 or more for larger pools or those with difficult access lots of decking materials plumbing or other structures.
Structural fill dirt costs 10 to 30 per cubic yard depending on the amount needed.
If your pool is 20 feet long by 15 feet wide with a maximum depth of 6 feet you could be looking at roughly 60 to 100 per cubic yard.
See professionally prepared estimates for pool removal and backfilling work.
Small pools with easy access run about 10 000 15 000.
The average price to fill in an inground swimming pool commonly referred to as a partial pool removal falls between 3 500 and 5 000.
Based on pool that s 6 deep.
Filling in your pool averages 12 per cubic yard.
Tailings are small stones that are a byproduct of our topsoil screening process.
Get fair costs for your specific project requirements.
The cost to remove a pool starts at 114 141 per cubic yard but can vary significantly with site conditions and options.
Expect to pay thousands for the dirt fill unless you have a cheap or free source already lined up.
In addition to fill dirt you will also need topsoil so you can plant grass a garden or a tree where the pool once was.
Consider covering the pool with dirt and laying down a lawn.
See typical tasks and time to remove a pool along with per unit costs and material requirements.
We have another material called tailings which cost only 5 00 per cubic yard.
Our fill is 12 00 per cubic yard.
As the dirt reaches the top of the pool drive over the layers with the excavator to pack it in which helps prevent settling.
Unless you have a jackhammer and experience using one you ll need to hire a contractor to break up your pool and level the rim.
Local demolition rules may impact how much it costs to remove a pool and what you can use for fill.
Contact a local swimming pool builder for guidance on the rules that apply to you.
This covers the cost of labor but there may be additional charges for soil.
Regular fill dirt is preferred but tailings are also an option.
Use the excavator to transfer dirt into the hole by pushing it or picking it up with the bucket.
A good rule of thumb is ordering 80 fill tailings and 20 topsoil for the surface.
Get enough so that the top 20 of the ground is topsoil.